Lessons7 · Less than a stud

A slope in steps

A wall can lean without a hinge and without a slope brick. Build it in courses and set each course a little further in than the one below. When the step is small enough, the stairs read as one slope.

Step and rise

Two numbers decide the lean. The step is how far a course moves in. The rise is how tall a course is. The lean, measured from upright, is the angle whose tangent is the step divided by the rise.

The rise is hard to change: a plate is 8 LDU, a brick 24, and a tile two studs long, stood on its side, 40. The step is where the choice is, and the offsets of this lesson are the steps.

The idea comes from Brick Sculpt, whose obelisk tapers in steps counted in LDU: see LEGO Draw Units and the obelisk, version 1.0 revisited and the finished build. The three builds below were worked out for this page and are not copies of his.

steprise
Three courses, each one step further in. The dashed line is the slope they add up to.

Half a stud a course

The largest offset gives the coarsest slope. A jumper 1 × 2 (15573) on a 1 × 2 brick moves the next brick half a stud in. A brick and a jumper make a rise of 32 LDU, the step is 10, and the lean is 17.4°.

Every step shows. That suits a stepped roof. It does not pass for a flat face.

1010Three 1 by 2 bricks stacked with a jumper plate between each pair, each brick half a stud further in than the one below, like stairs
Three 1 × 2 bricks with a white jumper between each pair. Each brick stands 10 LDU further in than the one below.

Half a plate a course

To hide the stairs, face each course with a tile on side studs and let the part behind the tile set the step. A 1 × 2 tile on its side needs two side studs 20 LDU apart, one above the other, and two parts have them. The tall brick with two side studs (32952) holds the face of the tile 18 LDU from the centre of the column. The inverted bracket 1 × 1, two studs tall (73825), with a brick and a plate on it, holds it at 22. Both courses are 40 LDU tall.

A plate on its side behind the tile adds 8. So one column gives 38, 34, 30, 26 and 22: bracket with two plates, tall brick with two, bracket with one, tall brick with one, bracket alone. Each course stands half a plate further in, a lean of 5.7°.

After those five the face has moved in one stud. Close the column with a tile in place of the last plate, and start the same five on the next column in.

44A column of an inverted bracket, a tall brick with two side studs and a second bracket, with a blue 1 by 2 tile on the side of each: each tile stands half a plate further in than the one below
The last three courses of the five. Blue, the 1 × 2 tiles of the face: 30, 26 and 22 LDU from the centre of the column. White, the plates on their sides.

A quarter plate a course

The finest step that common parts give is the quarter plate: half a stud one way and a plate the other. Stand every bracket on a jumper, half a stud further in than the bracket below, and give it one more plate on its side behind the tile. The course goes in 10 and comes back out 8.

On a rise of 40 that is a lean of 2.9°. The plates behind the tile grow by one every course, so this is for a short run: the last courses of a tower, the tip of a spire.

22Three inverted brackets stacked on jumpers, each half a stud further in than the one below, carrying none, one and two white plates on their sides under a blue 1 by 2 tile: the blue face leans in by a quarter plate a course
Three brackets, each on a white jumper half a stud further in, with none, one and two white plates on their sides. The blue face steps in 2 LDU a course. The 1 × 2 brick over each bracket carries the next jumper.
10−8=2 LDU

Every step on three rises

The table gives the lean for each offset of this lesson on a rise of one plate, one brick and one 40 LDU course. It is arithmetic: only the three builds above were checked part by part.

Lean from upright for a step and a rise. The picture shows the step on a rise of 40, to scale.
ViewStep, LDUMade fromSumRise 8Rise 24Rise 40
10A jumper1051.3°22.6°14.0°
8A plate on its side845.0°18.4°11.3°
4A bracket wall, or the recess of a headlight brick426.6°9.5°5.7°
2A jumper against a plate on its side10 − 814.0°4.8°2.9°
1A headlight recess against the wall of the thin neck bracket4 − 37.1°2.4°1.4°

Download CSV

The catch: corners

A tower that tapers on all four sides gets narrower by two steps every course, one on each side. The tiles of a face come in whole studs and cannot shrink with it. So the corners of a tapering tower have to be closed some other way. This page does not solve them: it builds one face.

stepsteptwo steps narrower
Seen from above: one course, blue, standing on the course below, grey.

With fills and offsets in hand, the next lesson chains two converters to turn a stud all the way round.